Center School
Project: Addition/Renovation • Location: Hanover, MA • Square Footage: 57000
Status: Completed
Last Updated: 21 October, 2021
P3 is a full service management company offering a full range of services
Status: Completed
Last Updated: 21 October, 2021
Last Updated: 21 October, 2021
P3 was invited to explore replacing the entire roof at the Gloucester High School in 2017. After successfully bidding the project well below budget, the roof was completely replaced on time before the opening of school in the Fall of 2017. Due to significant bid savings, the project team and City elected to proceed with…
Last Updated: 1 December, 2021
Due to our extensive experience window replacement projects, P3 was hired by the City of Springfield to manage their own window and door replacement project for their South End Middle School building. As of March 2018, the project budget is being prepared for the Mass. School Building Authority’s review and consideration. When the project is…
Last Updated: 31 January, 2018
Roof Replacement This project includes the removal of the reinforced EPDM membrane roof system down to the concrete deck. The new roof systems include new vapor barrier over the existing roof decks, new mechanically fastened polyisosanurate insulation, new fully adhered gypsum cover board and fully adhered EPDM membrane. All metal fascias will be replaced with…
Last Updated: 1 February, 2018
Roof Replacement This project includes the removal of the reinforced EPDM membrane roof system down to the concrete deck. The new roof systems include new vapor barrier over the existing roof decks, new mechanically fastened polyisosanurate insulation, new fully adhered gypsum cover board and fully adhered EPDM membrane. All metal fascias will be replaced with…
Last Updated: 1 February, 2018
Roof Replacement This project includes the removal of the reinforced EPDM membrane roof system down to the concrete deck. The new roof systems include new vapor barrier over the existing roof decks, new mechanically fastened polyisosanurate insulation, new fully adhered gypsum cover board and fully adhered EPDM membrane. All metal fascias will be replaced with…
Last Updated: 1 February, 2018
Window Replacement Housing 450 elementary students, the Shawsheen Elementary School project consisted of the replacement of the window systems as well as the primary and secondary door systems throughout the building.
Last Updated: 1 February, 2018
The window replacement at the Vo-Tech included replacement of the existing window systems, abatement of asbestos sealants and new windows systems and sealants. The new windows have energy efficient low E, argon filled, tempered insulating glazing and within thermally broken aluminum frames. The roof replacement consisted of removing the current membrane and insulating material followed…
Last Updated: 1 February, 2018
Housing 1600 high school students, the Westfield High project has replaced the existing dual fired boilers with three dual fired hot water boilers. New piping for oil and gas has been extended to the boilers and new supply and return headers were designed and extended to the system. Provisions for a new boiler breeching system…
Last Updated: 1 February, 2018
Phase I: Roof Replacement Removed the existing roof membrane system including the insulation, repaired the roof deck as needed, and provided a new roof membrane and insulation. Phase II: Boiler Replacement The two existing dual fired cast iron sectional steam boilers were replaced with one new dual fired hot water boiler and one new gas…